Stage Collar Specifications & Port Configuration
| Specification |
Value |
| Function |
Enables second-stage cementing of upper casing sections after the primary job |
| Position in String |
Installed above the first-stage interval in the casing string |
| Flow Path |
Provides ports for cement slurry to be displaced higher in the annulus |
| Port Control |
Ports open for second-stage pumping and close after displacement to seal |
| Internal Seats |
Accepts plug/ball seats to isolate and shut off flow after the stage |
| Body |
Heavy-duty steel body engineered for downhole loads and circulation |
| Customization |
All parts customizable (materials, connections, seats, port configuration) |
| Quality |
Built to stringent QC standards for maximum downhole performance |
| Compatibility |
Matches standard casing sizes, grades, and thread connections |
Stage collar cementing
| Aspect |
Detail |
| Primary Purpose |
Cement upper sections of the annulus immediately after the primary displacement |
| Use Cases |
Long strings, lost-circulation zones, or when top-of-cement targets are higher |
| Benefits |
Improved cement placement control; reduced risk of over-displacement and losses |
| Operation |
Launch plug(s), open stage ports, pump spacer/cement, then close and isolate |
| Planning Note |
Select port area and seat sizes to match slurry rate, density, and job pressures |
| Reliability |
Seals after the stage to restore casing integrity and allow further operations |
| Custom Order |
Specify casing size/weight/grade and desired connection for an exact match |
Need availability? Ask our team now