, ,

Cementing Head-SH62

Cementing Head-SH62

The Cementing Head-SH62 controls cementing plug release during casing cementing operations. Operators mount it on the casing string at surface before pumping, then launch the plug according to the cementing sequence.

This model includes an integrated manifold for fluid circulation line connection. As a result, it supports safer plug control and more reliable cement placement during standard casing cementing jobs.

SH62 Technical Data

Item Description
Main Function Controls cementing plug release during casing cementing
Plug Sequence Launches bottom and top plugs according to the pumping program
Configuration Available in single-plug and double-plug designs
Manifold Integrated manifold for circulation line connection
Size Range 4 1/2″ to 13 3/8″
Installation Mounted on the casing string at surface before pumping
Operation Use Plug launching, fluid circulation, and cement displacement control
Compatibility Standard casing sizes within the stated range

Why Choose Cementing Head-SH62?

The Cementing Head-SH62 helps operators manage plug release without interrupting the cementing sequence. Also, its manifold connection supports fluid circulation before or during the job. Therefore, the crew can keep better control over plug launching, displacement, and surface cementing flow.

Need the right cementing head for your casing program? Send an enquiry to Saxon Drilling for SH62 size, configuration, and availability details.